Paragraph 79 building: update June 2019
June 2019 update bulletin. Hux Shard NPPF Paragraph 79 building test zinc application and further construction.
- Garage shards being prepped for boarding before zinc application.
- Crane arrives on site to begin Phase 3, preparation by the assembly team for stacking and erection order.
- Shard elements lifted in to place.
- Hux Shard test zinc application.
- Phase 3 floor beams in position ready to take the floor joists.
- Phase 3 floor joists in position.