Hux Shard Update March 2021
Edging preparation using Everedge profiles, ready for the granite setts on the pathways and profiles from Andrew Hicks engineering laid ready to receive the Millboard decking.
Edging preparation using Everedge profiles, ready for the granite setts on the pathways and profiles from Andrew Hicks engineering laid ready to receive the Millboard decking.
Finishing touches to the positioning of the glazing in the master en-suite and living area with lighting strips framing the corridor transitional areas.
Gabion walls and shards illustrating the subtle transition between hard and soft landscaping in the amenity areas of the dwelling.
Winter light ingress is softer at this time of year, the design allows natural light to animate the internal spaces across all seasons. The entrance driveway takes shape.
Attention to detail – very minor differences in shade can have a huge impact when used at macro and micro scale. Developments of internal spaces.
The wildflower meadow features an abundance of colour and illustrates how the building will, over time, meld into the surrounding landscaping. Early white washing of the plasterboard.
Glazing continues to be installed across the site with the zinc cladding complementing the clean lines on the external facades, giving insight into how the completed building will look.
Cladding of the exterior shards and glazing installation allows for the insulation and floor finish to be installed. Exterior landscaping begins to take shape, allowing seasonal growth and establishment in advance of occupation.
Initial glazing installation commences for the gym/games room, kitchen and entrance areas. Paragraph 79 House in Devon.
The shards are really taking form now that they are receiving their cladding. Preparation for the glazing is underway and comms and data infrastructure is being installed.